In 1836, granite from the Chola temple complex was removed for construction of the Lower Coleroon Anicut. In 1836, work began on the Lower Coleroon Anicut across the Kollidam River in Tamil Nadu. The project needed large quantities of stone. Nearby stood an 800-year-old Chola temple built largely from granite. It became a quarry. A Capital Built in Stone The Brihadisvara Temple at Gangaikondacholapuram was built by Rajendra Chola I as the centrepiece of his new imperial capital. Completed in 1035, its 53-metre vimana rises in a graceful curve, noticeably different from the straighter and more severe tower built by Rajendra’s father at Thanjavur. ( UNESCO World Heritage Centre ) Completed under Rajendra Chola I in 1035, the temple’s 53-metre vimana remains the dominant surviving feature of the former Chola capital. Eight centuries later, that carefully worked granite attracted attention for a very different reason. It could be reused. What the Historical Record ...

Part 3 — CD & Permit Sets: Drawing It the Way It Gets Built | Blueprint to Build

Most permit rejections aren't about design. They're about documentation.
The CD and permit set is the package that gets the house approved and built. It speaks to three audiences at once — the permit reviewer, the contractor, and the builder's team. Miss what any one of them needs and the project stalls.
 
Missed Part 2? Read Lot Sets: Same House, Different Story here. 


What a complete set covers:
• Site plan, floor plans, all four elevations
• Building and wall sections
• Roof plan and framing notes
• Energy compliance documentation
• Door, window, and finish schedules
• Structural callouts per local code


What makes it actually work:
Dimensions that don't need interpretation. Details that reference back to plans. Notes that are specific, not generic. Energy compliance calculated, not assumed.

When a contractor builds without calling the office — good set. When the permit clears first submission — great set.


Part 4 — AutoCAD vs. Revit: Which, When & Why
 
Blueprint to Build Series:
Part 1 — The Master Set: Where Every Home Begins
Part 2 — Lot Sets: Same House, Different Story
Part 3 — CD and Permit Sets: Drawing It the Way It Gets Built (you are here)
Part 4 — AutoCAD vs. Revit: Which, When and Why 
 
All images in this post were generated using AI (ChatGPT / DALL-E) based on custom prompts created for this article. They are used for illustrative purposes only. 